Pearland Business Park
Warehouse / Industrial · Pearland, TX

Pearland Business Park

Multi-building warehouse and industrial park totaling approximately 124,000 sq ft — tilt-up concrete, metal components, and full site development.

Pearland Business Park aerial drone view Pearland Business Park exterior
Pearland, TX · 2024 124,000 sq ft · Delivered
Pearland Business Park aerial
Project Overview

Built to move freight.

A multi-building warehouse and industrial park totaling approximately 124,000 sq ft, delivered with tilt-up concrete walls, metal building components, full site development, and truck access circulation.

The site supports a mix of warehousing, office, and future tenant improvements — designed for phased occupancy and flexible long-term tenant needs. KGC self-performed tilt-up panels, slab-on-grade, and site concrete, giving the owner a single point of accountability for the project's critical path.

Delivered on time, on budget, and ready to operate the day of handover.

124,000
Square Feet
Tilt-Up
Method
Pearland, TX
Location
2024
Delivered
The Challenge

A phased delivery under one contract.

The owner needed 124,000 sq ft of flexible industrial space in Pearland — ready for phased tenant occupancy within an aggressive schedule, across multiple buildings, with site logistics coordinated from day one.

Key constraints: Gulf Coast drainage requirements meant site grading and detention had to be resolved before vertical work could start. Future tenant layouts were still being finalized during shell construction. Truck access for multiple concurrent tenants needed to be planned before the first lease was signed.

The Approach

Self-performed critical path.

KGC delivered the project under a single-contract model with the critical-path scopes — site concrete, slab-on-grade, and tilt-up panels — kept in-house under direct superintendent control.

Tilt-up panels were cast on-site and erected in phased sequence, letting interior work begin on completed bays while the outer shells were still closing in. Our prefab planning let us compress the envelope schedule and give the owner predictable delivery dates for tenant coordination.

Scope Breakdown

Self-performed + owner-led coordination.

01

Site Work

Grading, Gulf Coast-compliant drainage and detention, truck courts, trailer yards, concrete paving, utility coordination.

02

Foundations

Slab-on-grade with high-bay racking-ready finish tolerances. F-number testing documented for future tenant requirements.

03

Tilt-Up Concrete

Self-performed panel casting and erection. Lift plan reviewed with crane operator and rigger pre-shift for every panel set.

04

Metal Building System

Steel structural system integrated with tilt-up envelopes. Dock levelers, overhead doors, and loading-side concrete aprons.

05

Shell & Roof

TPO roofing, exterior sealing, rough-in MEP to code. Ready-to-improve interior state for tenant fit-outs.

06

Tenant Coordination

Phased tenant improvement coordination with brokers, tenant architects, and future occupants — ahead of each lease signing.

Outcomes

By the numbers.

124K
Square Feet Delivered
On Time
vs. Owner Schedule
Phased
Tenant Occupancy
0
Recordable Incidents

Have a similar project?

Start a Project